Project | Tidemill Academy, London |
Architect | Pollard Thomas Edwards |
Main Contractor | Galliford Try |
Fabricator & Installer | Details available on request |
Project Summary
The multi award-winning Tidemill Academy was central to the regeneration of Deptford town centre, the stunning building creating a brand new facility for local residents.
With Smart’s MC Wall curtain walling system at its heart, the Academy’s façade incorporates a number of striking features – including the building’s distinctive gold-coloured, perforated panels which have been used to clad the curtain walling. Smart Wall entrance doors to the school reception area complete the exterior of the building.